Commercial Dev. at Wuse II, Abuja
Client: Barclays Investment Multipurpose Co-operative Society Ltd.
God's Own Plaza, Takum Close, Garki 2, Abuja
Status: Ongoing
Architect: Opeg Design Studio Ltd.
Structural Engineer: Joseph Engineering Associates (Nig.) Ltd.
Service Engineer: Green Age Sustainable Engineering Limited
Contractor: 3ADB Limited